Utilities Navigation


Wastewater Department

Educational: Where does the water go? | What are Biosolids? | What is Reclaimed Water?

Biosolids: Tariffs | Biosolids Analysis Sheet

Reclaimed Water: Tariff | Driver Transaction Process

Reclaimed Water Analysis Sheets and Turbidity click to expand

Reclaimed Water Analysis Sheets:

State Requirements:

Turbidity: 3.0 NTU Max
CBOD: 5mg/l Max
E. Coli: 75/100 ml Max

NTU - Nephelometric Turbidity Unit - White light, 90 degree detection only - USGS testing technique information

 Bobby Keene, Jr.. - Wastewater Systems Superintendent - Office: 979-337-7445

Wastewater Collection

The Wastewater Collection Department is responsible for the maintenance and operation of 139 miles of sewer mains, 6,243 sewer connections, over 2,000 manholes and serves more than 6,400 customers.

Responsibilities of this department include:

  • Installation of wastewater mains
  • Wastewater connections
  • Routine manhole inspections
  • Wastewater blockages or overflows
  • Wastewater odors

The department is also responsible for inflow and infiltration issues. This is done by conducting an annual smoke testing program. Each year, one-quarter of the city is tested. This form of testing will show indications of a broken sewer line. Owners of properties indicating an inflow problem are notified by mail that a repair of this is needed. In general, the repairs required are minor. Once the problem has been corrected, a technician will inspect the repair for verification.

Wastewater Treatment

Inlet Lift Station
Inlet Lift Station

The Wastewater Treatment Plant (WWTP) is responsible for the treatment of wastewater received from the wastewater collection system for discharge into local creeks. The wastewater must be treated to meet strict federal and state limits before being discharged.

The wastewater is received by gravity flow to the treatment plant. Once at the plant, the wastewater enters the main lift station and is pumped in the head works where (2) mechanical bar screens remove large objects from the wastewater. The wastewater then flows through a grit chamber where sand and grit is removed.

After this process, the wastewater flows into a diverter box where the flow is divided between the new aeration basin and the old aeration basin. The wastewater is then aerated for additional treatment with bacteria and other organisms which help breakdown the solids.

Wastewater Clarifier
Wastewater Clarifier

Once this is done, the wastewater enters the clarifiers where the solids settle out. The clear supernatant then flows to the chlorine contact chamber where it is treated with Chlorine, followed by de-chlorination with Sulphur Dioxide in order to discharge into Hog Branch Creek.

The wastewater must be treated to meet strict federal and state limits before being discharged. The remaining solids from the bottom of the clarifiers are pumped into the 4 large digesters which also help break down the solids by final aeration, organisms and bacteria. The remaining solids are then pumped to the belt press and treated as Class "A" biosolids which are then sold to local farmers and ranchers as a soil enhancer.

The WWTP has the capacity to treat up to 3.55 million gallons per day.

Currently, the WWTP is has expanded its operation to include a Reclaimed Water Station which allows bulk water sales of effluent to be used by contractors during construction rather than using potable water.

BEFORE YOU DIG - DIAL 811. IT'S THE LAW!!!

Water   Blue
Sewer   Green
Gas   Yellow
Electric   Red

Color codes for Utilities Markings

Digging can be dangerous. There are buried utilities throughout the city. Hitting a utility line can be both dangerous and costly. Without knowing the locations of the buried utilities, you jeopardize your safety as well as others and the inconvenience of being without the service.

Before beginning any project that requires you to move earth, DIAL 811. This is a free service available 24 hours a day, 7 days a week. The locate center will contact the city and the utilities departments will mark their lines within 2 business days. Wait the required time - at least 2 business days. Once lines are marked, dig with care and dig safely by hand-digging within 18 inches of any marking.

 